{"id":245466,"date":"2017-01-26T18:21:52","date_gmt":"2017-01-26T15:21:52","guid":{"rendered":"http:\/\/www.nationalturk.com\/?p=245466"},"modified":"2017-01-26T18:21:52","modified_gmt":"2017-01-26T15:21:52","slug":"son-dakika-dev-ihaleyi-kazanan-firma-yine-tanidik","status":"publish","type":"post","link":"https:\/\/www.nationalturk.com\/tr\/son-dakika-dev-ihaleyi-kazanan-firma-yine-tanidik\/","title":{"rendered":"Son Dakika! Dev ihaleyi kazanan firma yine tan\u0131d\u0131k"},"content":{"rendered":"<h1>Ula\u015ft\u0131rma, Denizcilik ve Haberle\u015fme Bakan\u0131 Arslan, 1915 \u00c7anakkale K\u00f6pr\u00fcs\u00fc ve ba\u011flant\u0131 yollar\u0131 ihalesinde en k\u0131sa s\u00fcreyi, Daelim- Limak &#8211; SK- Yap\u0131 Merkezi OGG&#8217;n\u0131n verdi\u011fini a\u00e7\u0131klad\u0131.<\/h1>\n<p>Bakan Ahmet Arslan, d\u00fczenledi\u011fi toplant\u0131da, K\u0131nal\u0131-Tekirda\u011f-\u00c7anakkale-Sava\u015ftepe Otoyolu Projesi Malkara-\u00c7anakkale (1915 \u00c7anakkale K\u00f6pr\u00fcs\u00fc dahil) kesimi i\u00e7in Yap-\u0130\u015flet-Devret (Y\u0130D) modeli\u0307 kapsam\u0131nda yap\u0131lan ihalede 4 ortak giri\u015fim grubunun teklif verdi\u011fini belirtti.<\/p>\n<p>Daelim (Kore)-Limak (Nihat \u00d6zdemir)-SK (Kore)-Yap\u0131 Merkezi OGG&#8217;nin ortaya koydu\u011fu proje bedelinin 10 milyar 354 milyon 576 bin 202 lira oldu\u011funu ifade eden Bakan Arslan, bu bedele kar\u015f\u0131l\u0131k 5,5 y\u0131ll\u0131k yap\u0131m s\u00fcresi dahil olmak \u00fczere \u00f6nerdikleri toplam s\u00fcrenin 16 y\u0131l 2 ay 12 g\u00fcn oldu\u011funu bildirdi.<\/p>\n<p>IHI (Japon)-Itochu (Japon)-Join (Japon)-Makyol-Nurol-Japon Express Way&#8217;den (Japon) olu\u015fan ikinci grubun \u00f6nerdi\u011fi toplam yat\u0131r\u0131m bedelinin 10 milyar 494 milyon 574 bin 500 lira oldu\u011funa i\u015faret eden Ahmet Arslan, bu grubun da 5,5 y\u0131ll\u0131k yap\u0131m s\u00fcresi dahil \u00f6nerdikleri toplam s\u00fcrenin 17 y\u0131l 10 ay 24 g\u00fcn oldu\u011funu kaydetti.<\/p>\n<p>Arslan, Cengiz-Kolin-CRBC (\u00c7in) OGG&#8217;nin toplam yat\u0131r\u0131m bedelinin 10 milyar 324 milyon lira, 5,5 y\u0131ll\u0131k yap\u0131m s\u00fcresi dahil \u00f6nerdikleri toplam s\u00fcrenin 18 y\u0131l 8 ay 19 g\u00fcn oldu\u011funu ifade ederek, IC \u0130\u00e7ta\u015f-Astaldi&#8217;den (\u0130talyan) olu\u015fan d\u00f6rd\u00fcnc\u00fc grubun ise toplam yat\u0131r\u0131m bedeli 11 milyar 575 milyon 960 bin lira, \u00f6nerdikleri toplam s\u00fcrenin de 18 y\u0131l 5 ay 15 g\u00fcn oldu\u011funu dile getirdi.<\/p>\n<p>&#8220;Kurum olarak \u00e7al\u0131\u015ft\u0131\u011f\u0131m\u0131z rakamlarla \u00f6rt\u00fc\u015f\u00fcyor&#8221;<br \/>\nBakan Arslan, &#8220;Bu rakamlar \u00e7er\u00e7evesinde \u015fu an i\u00e7in en k\u0131sa s\u00fcreyi veren Daelim-Limak-SK-Yap\u0131 Merkezi grubu. 5,5 y\u0131ll\u0131k yap\u0131m s\u00fcresi dahil \u00f6nerdikleri s\u00fcre toplam 16 y\u0131l 2 ay 12 g\u00fcn. Rakamlar bunlar, s\u00fcreler ortada. Proje bedelini d\u00fc\u015f\u00fcnd\u00fc\u011f\u00fcm\u00fcz zaman bizim de kurum olarak \u00e7al\u0131\u015ft\u0131\u011f\u0131m\u0131z rakamlarla \u00f6rt\u00fc\u015f\u00fcyor.&#8221; \u015feklinde konu\u015ftu.<\/p>\n<p>Komisyonun \u015fu andan itibaren \u00e7al\u0131\u015fmalar\u0131na devam edece\u011fini belirten Arslan, teknik ve ayr\u0131nt\u0131l\u0131 \u00e7al\u0131\u015fmalar\u0131n yap\u0131l\u0131p bitirilmesinden sonra herhangi bir aksakl\u0131k yoksa en k\u0131sa s\u00fcreyi veren grupla s\u00f6zle\u015fmenin imzalanaca\u011f\u0131n\u0131 ifade etti.<\/p>\n<!-- Error, Advert is not available at this time due to schedule\/geolocation restrictions! -->\n","protected":false},"excerpt":{"rendered":"<p>Ula\u015ft\u0131rma, Denizcilik ve Haberle\u015fme Bakan\u0131 Arslan, 1915 \u00c7anakkale K\u00f6pr\u00fcs\u00fc ve ba\u011flant\u0131 yollar\u0131 ihalesinde en k\u0131sa s\u00fcreyi, Daelim- Limak &#8211; SK- Yap\u0131 Merkezi OGG&#8217;n\u0131n verdi\u011fini a\u00e7\u0131klad\u0131. Bakan Ahmet Arslan, d\u00fczenledi\u011fi toplant\u0131da, K\u0131nal\u0131-Tekirda\u011f-\u00c7anakkale-Sava\u015ftepe Otoyolu Projesi Malkara-\u00c7anakkale (1915 \u00c7anakkale K\u00f6pr\u00fcs\u00fc dahil) kesimi i\u00e7in Yap-\u0130\u015flet-Devret (Y\u0130D) modeli\u0307 kapsam\u0131nda yap\u0131lan ihalede 4 ortak giri\u015fim grubunun teklif verdi\u011fini belirtti. Daelim (Kore)-Limak &hellip;<\/p>\n","protected":false},"author":4,"featured_media":245467,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[6199,6155,5005,349],"tags":[1005,209828,202021,66323,5170],"class_list":["post-245466","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ekonomi","category-gundem","category-manset","category-son-dakika","tag-canakkale","tag-canakkale-koprusu","tag-cengiz-holding","tag-limak","tag-nihat-ozdemir"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.nationalturk.com\/tr\/wp-json\/wp\/v2\/posts\/245466","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nationalturk.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nationalturk.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nationalturk.com\/tr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nationalturk.com\/tr\/wp-json\/wp\/v2\/comments?post=245466"}],"version-history":[{"count":0,"href":"https:\/\/www.nationalturk.com\/tr\/wp-json\/wp\/v2\/posts\/245466\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.nationalturk.com\/tr\/wp-json\/wp\/v2\/media\/245467"}],"wp:attachment":[{"href":"https:\/\/www.nationalturk.com\/tr\/wp-json\/wp\/v2\/media?parent=245466"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nationalturk.com\/tr\/wp-json\/wp\/v2\/categories?post=245466"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nationalturk.com\/tr\/wp-json\/wp\/v2\/tags?post=245466"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}